May 2026 EpicMod homes now eligible for CMHC Prefab Plus insured financing — as little as 5% down.  •   New 20,000 sq ft Belleville facility — Q2/Q3 2027! About the new facility →

Volume
Supply
10+ Units

Factory-direct modular supply for developers, builders, general contractors, investment groups, non-profits, municipalities and Indigenous housing organizations building 10 or more units in a single project.

Supply for Projects
You Control

A Volume Supply account (our direct supply channel) is for organizations building for themselves. You buy the units for a project you own or control, and the agreement covers the units and their delivery.

Your quote is written against your unit mix, with every exclusion listed, so the number your board, council or lender sees is the one you build to.

All units in a phase are built in the same timeframe, not one after another, and manufacturing runs while your site is prepared.

10+
Units in one project
10–12
Weeks after order
6
Storeys, low- to mid-rise
~40
Years of experience

Built for Organizations
Delivering Housing

Developers & Investment Groups

Rental, infill and subdivision projects where a fixed unit price and a factory schedule de-risk the pro forma.

Builders & General Contractors

Add factory-built units to your projects and keep site work, foundations and finishing with your own trades. For builders.

Municipalities & Housing Providers

Affordable, supportive and transitional housing, with a written quote and delivery schedule your council can take to a funding decision.

Non-Profit & Co-op Housing

Repeatable designs released in phases as funding is confirmed, with no redesign between rounds.

Indigenous Housing Organizations

Band councils, tribal councils and housing authorities, on reserve and off. Community housing.

Employers & Institutions

Staff, workforce and student housing on land you already control.

From One Building Type
to a Whole Subdivision

Building typeTypical use
Single detachedSingle-storey homes, studio to two bedrooms plus den, on a strip foundation or helical piles
ADUs and garden suitesA second home on an existing lot, for family members or rental
Semi-detachedTwo households per building where land or servicing is limited
Townhomes and row housingConsistent unit to unit, built as panels or modules
Fourplexes and sixplexesThe densest forms covered by the CMHC Housing Guidelines
Low- and mid-rise to 6 storeysSuites craned onto a site-poured foundation
Transitional and elder housingSenior-friendly single-level layouts, with barrier-free options
Workforce and staff housingHealth, education, resource and administration staff on employer or community land

What Changes for a
Multi-Unit Project

FactorEpicMod modularConventional site build
Build timeline10–12 weeks post-order12–18+ months
Ten homesAll built in the same timeframeBuilt one after another
WeatherIndoors, year-roundDelays through freeze-up and spring
LabourFactory crews, no camp needed on siteTrades housed and mobilised to site
Cost certaintyUnit price fixed at contractOverruns common (10–30%+)
Engineering drawingsIncluded at no extra costExtra cost
Material wasteUp to 30% less wasteSignificant waste to haul out

Timelines are measured from the order being placed. Site work (clearing, servicing, foundations and utility connections) is separate from the unit price.

Choose What Arrives
on Site

Exterior-Finished Shell
  • Structurally complete: roofing, cladding, windows and doors
  • Framed interior partition walls
  • Arrives ready for inspection
  • Interior finishing by your own trades, useful where work is kept local or spend is staged across budget years
Fully Finished, Plug and Play
  • Feature List finishes throughout
  • Kitchen and laundry appliances
  • Certification included
  • Arrives ready for utility hook-up on a prepared foundation

Panels or
Whole Modules

Both come from the same factory. The site, the road in and how much work you want done locally usually decide which fits. Many housing plans use both.

Full comparison as text
 Panelized framingVolumetric modular
What arrivesWall panels, floor cassettes, roof panels and additional lumberFinished three-dimensional modules
Site labourLocal crews assemble the framingCraned in; tie-ins and inspection only
Local workMost of the build stays with your tradesSite prep, utility hook-up, foundation and finishing
Site accessHandles tight lots and difficult roadsNeeds crane access and a delivery route
Design freedomAny plans your architect providesFrom the EpicMod catalogue
Best forSubdivisions and multiplexesRepeated units, apartments, remote sites, speed and hands-off management

Large panelized framing runs (above 100,000 sq ft) are also supplied direct. See panelized framing.

What’s Included,
What Isn’t

Included and excluded, as text
Included in the Unit Price
  • The units and the 2-year structural warranty on the module
  • Engineering and permit-ready drawing package for your permit application
  • Shells: structural and architectural drawings
  • Fully finished: structural, architectural, mechanical and electrical drawings plus certification, Feature List finishes and appliances
Not Included
  • GST/HST
  • Transportation and crane
  • Site clearing, servicing and foundations
  • Utility connections, and permit or approval fees
  • Interior finishing on the exterior-finished shell

Warranty. EpicMod warrants the manufactured structure on the published structural terms for each model. Installation, site work, foundations and servicing are warranted by whoever performs them, which on your own projects means you or your trades.

What Happens,
and When

All weeks are counted from the order being placed.

Week-by-week detail as text
1
Weeks 0–2: Unit mix

Models or catalogue plans matched to the unit sizes you need, and the finish level set per unit. The engineering drawing set is provided for your permit submission once the order is confirmed.

2
In parallel: Permits

Permit approval runs alongside manufacturing. Timing depends on your approving authority.

3
Weeks 1–10: Build and site prep

Units are built indoors while clearing, servicing and foundations proceed on site, so the two schedules overlap instead of queueing.

4
Weeks 10–12: Delivery and set

Units are trucked in and craned onto the foundation, typically one to two per day. Tie-ins and occupancy follow, with the 2-year structural warranty on the module.

How Multi-Unit
Projects Get Financed

Off-reserve rental. Since May 2026, CMHC’s multi-unit mortgage loan insurance covers modular construction across all its programs, including MLI Select: up to 95% loan-to-cost, with rates typically 1–2% below conventional multi-unit financing.

On-reserve housing. Financed federally rather than through conventional mortgage insurance, typically a combination of program funding, ministerial loan guarantees and community capital. Factory-built homes are eligible construction.

Federal direction. Build Canada Homes has named modular and panelized framing the primary methods for Canada’s housing supply targets, with $13 billion committed and more than 4,000 factory-built homes already commissioned.

EpicMod supplies the drawing set, specifications and delivery schedule any lender or funding body asks for. Programs change, so confirm the route with your lender or funding body before committing. More on rental and multi-unit funding.

From First Call to
Written Quote

1
Tell us the need

How many units, what sizes, where, and the funding or financing you’re working against.

2
Unit mix

We match models or catalogue plans to that need and confirm the finish level for each unit.

3
Written quote

Unit pricing, every exclusion in full, and a delivery schedule you can take to a board, council or lender.

Volume Supply FAQs

10 units in a single project. Projects of that size can deal with EpicMod directly through a Volume Supply account. Smaller projects are supplied through the authorized EpicMod dealer for the area, who carries the full lineup.
Developers, builders, general contractors, investment groups, non-profits, municipalities and Indigenous housing organizations buying units for projects they own or control.
The engineering and permit-ready drawing package for the units purchased, provided for your permit application, and the 2-year structural warranty on the module. Exterior-finished shells come with structural and architectural drawings; fully finished units add mechanical and electrical drawings, certification, Feature List finishes and kitchen and laundry appliances.
GST/HST, transportation, crane, site clearing and servicing, foundations, utility connections, and permit or approval fees. Interior finishing is not included on the exterior-finished shell. Site work is the property owner’s responsibility, carried out by your own contractors.
10 to 12 weeks from the order being placed. All units in a phase are built in the same timeframe rather than one after another, while foundations and servicing proceed on site. Units are typically set at one to two per day.
Yes. Units are engineered for northern Ontario climate conditions, and two foundation types, concrete slab and pier or helical piles, mean difficult ground does not force a redesign. Delivery route and crane access are confirmed before manufacturing starts. Beyond the economic trucking radius for volumetric modules, EpicMod supplies panelized framing.
Since May 2026, CMHC’s multi-unit mortgage loan insurance, including MLI Select, covers modular construction, at up to 95% loan-to-cost for qualifying rental projects. On-reserve housing is financed federally through program funding and ministerial loan guarantees. EpicMod supplies the drawing set, specifications and delivery schedule a lender or funding body asks for. See rental and multi-unit funding.

Planning 10 or More
Units?

Send the unit count, the unit sizes, the site location and your funding timeline. You’ll get a unit mix, a written quote with the exclusions in full, and a delivery schedule, with no obligation.