May 2026 EpicMod homes now eligible for CMHC Prefab Plus insured financing — as little as 5% down.  •   New 20,000 sq ft Belleville facility — Q2/Q3 2027! About the new facility →

Factory Supply
for Builders

Volumetric modules and panelized framing for Ontario home builders, general contractors and renovation contractors. The factory builds while your crews prepare the site.

Take the Weather and
the Trades Queue Out

Units are built indoors, year-round, by factory crews, while your team clears, services and pours on site. The two schedules overlap instead of queueing, and every unit in a phase is built in the same timeframe.

You keep the work that belongs to you: site prep, foundations, tie-ins and, on shells, the interior. The factory takes the framing and the weather risk.

Every order includes the engineering drawing set for the permit application, and the unit price is fixed at contract.

10–12
Weeks after order
30%
Less waste (up to)
2
Foundation types
OBC
Built to code

Panels or
Whole Modules

Pick by the site, the access road and how much work you want your own crews to carry. Many projects use both.

Full comparison as text
 Panelized framingVolumetric modular
What arrivesWall panels, floor cassettes, roof panels and additional lumberFinished three-dimensional modules
Site labourLocal crews assemble the framingCraned in; tie-ins and inspection only
Local workMost of the build stays with your tradesSite prep, utility hook-up, foundation and finishing
Site accessHandles tight lots and difficult roadsNeeds crane access and a delivery route
Design freedomAny plans your architect providesFrom the EpicMod catalogue
Best forSubdivisions and multiplexesRepeated units, apartments, remote sites, speed and hands-off management

Who Does
What

EpicMod
  • Units or panels, built indoors
  • Engineering and permit-ready drawings
  • Delivery route and crane access confirmed before manufacturing
  • Structural warranty on the manufactured structure
Your Crew
  • Site clearing and servicing
  • Foundations: slab, strip, piers or helical piles
  • Crane and set, utility connections and permits
  • Interior finishing on exterior-finished shells
  • Warranty on the installation and site work you perform

Choose the
Right Channel

Volume Supply

For a project of 10 or more units you own or control. Factory-direct supply for your own project. Volume Supply.

Regional Partner

For contractors selling to homeowners: renovation contractors and ADU specialists. A region and the homeowner enquiries in it. Become a dealer.

Through a Dealer

For one-off projects under 10 units, buy through the authorized EpicMod dealer for the build site. Find a dealer.

A Typical
Build Sequence

All weeks are counted from the order being placed.

Week-by-week detail as text
1
Weeks 0–2: Unit mix

Models or catalogue plans matched to the unit sizes you need, and the finish level set per unit. The engineering drawing set is provided for your permit submission once the order is confirmed.

2
In parallel: Permits

Permit approval runs alongside manufacturing. Timing depends on your approving authority.

3
Weeks 1–10: Build and site prep

Units are built indoors while clearing, servicing and foundations proceed on site, so the two schedules overlap instead of queueing.

4
Weeks 10–12: Delivery and set

Units are trucked in and craned onto the foundation, typically one to two per day. Tie-ins and occupancy follow, with the 2-year structural warranty on the module.

Faster Approvals With
Repeatable Designs

EpicMod builds to the CMHC Housing Guidelines, the federal standard for housing design covering ADUs, townhomes, fourplexes and sixplexes. Because the layouts are pre-developed for repeat use, they cut design time and clear review faster than a one-off drawing set.

When none of the models fits, panelized framing is manufactured to your architect’s plans. A new model catalogue covering single-storey detached homes and ADUs is being issued shortly.

Builder FAQs

Two ways. For a project of 10 or more units that you own or control, a Volume Supply account gives factory-direct supply for that project. If you sell homes, ADUs or renovations to end customers, a Regional Partner agreement adds a region and its leads. One company can hold both.
Site clearing, servicing, foundations, crane, utility connections and permits, plus interior finishing if you take exterior-finished shells. EpicMod supplies the units or panels, the engineering drawings and the structural warranty on the module.
Two foundation types: a concrete slab or strip foundation, and piers or helical piles. That flexibility means difficult ground does not force a redesign.
EpicMod warrants the manufactured structure on the published structural terms for each model. Installation, site work, foundations and servicing are warranted by whoever performs them, which on your projects means you or your trades.
Yes. Panelized framing (wall panels, floor cassettes, roof panels and additional lumber) is manufactured to the plans your architect provides, and your crews assemble it on site. Volumetric modules come from the EpicMod catalogue.
Delivery route and crane access are confirmed before manufacturing starts. Units are trucked in and craned onto the prepared foundation, typically one to two per day, 10 to 12 weeks after the order.
Yes. The engineering and permit-ready drawing package for the units purchased is provided with the order: structural and architectural drawings for shells, plus mechanical, electrical and certification for fully finished units.

Have a Project
on the Board?

Send the unit count, the site and your schedule. You get a written quote against your unit mix, the exclusions in full and a delivery schedule.