News Flash EpicMod's new 20,000 sq ft facility is being built in Belleville, ON — opening Q2/Q3 2027. About the new facility →

Student Housing:
Funding and Approvals

Student housing has its own stream inside CMHC’s construction loan program, its own route to the GST rental rebate, and, for universities, its own planning rules. Here is what applies to a campus residence and to private student rental, and which test each one sets.

Programs and rules checked · drawn from CMHC, CRA and Ontario published material

Four Routes, One Residence

A student residence can carry insured construction financing, a rebate of the GST and the provincial part of the HST, and, for a taxable owner, faster depreciation. Each has its own test, and the owner’s identity changes which ones apply.

ProgramWhat it givesThe date that mattersWho it is for
CMHC Apartment Construction Loan Program, student streamInsured construction financing up to 100% loan-to-cost on residential space and up to 50-year amortisation, depending on the project’s scoring tierOngoing intake; allow 4 to 6 months for the application cycleUniversities, colleges, non-profit and private developers; minimum 5 units and a $1M loan
Federal purpose-built rental (GST) rebateUp to 100% of the GST, or the federal part of the HST, on a qualifying rental buildingConstruction begins before 2031, substantially complete before 2036Non-profit universities, public colleges and school authorities building residences; private owners of qualifying rental
Ontario’s provincial part of the HSTA rebate of 100% of the 8% provincial part where the federal purpose-built rental conditions are metSame dates as the federal rebateThe same owners as the federal rebate
Accelerated capital cost allowanceDepreciation at 10% declining balance instead of 4%Construction begins after April 15, 2024 and before 2031; available for use before 2036Taxable owners only, such as private developers. Universities and colleges are tax-exempt

Who the owner is decides the route. A non-profit institution building its own residence claims the public service body rebate first, and the purpose-built rental rebate covers the GST that rebate did not recover. A private developer uses the ordinary rental route and can add accelerated depreciation.

What CMHC Asks For

Since the 2024 federal budget, CMHC’s Apartment Construction Loan Program has covered on- and off-campus student housing, and it is still funding student projects in 2026. The student stream has rules the general program does not.

On campus
  • Self-contained units and non-self-contained units, such as rooms sharing a kitchen, are both eligible
  • The borrower can be the institution itself, a non-profit or a private developer
  • Non-residential space is capped at 30% of floor area and of cost
Off campus
  • Units must be self-contained, with no more than four bedrooms each
  • The site must be within walking distance of the campus or served by transit
  • A post-secondary institution must be meaningfully involved: developing, managing, funding, leasing units or selecting tenants
Rents and affordability
  • Rents for every unit or bed must be comparable to existing on-campus housing in the local market
  • Rent increases are limited for at least 10 years
  • The project must show a documented need for student housing
Loan terms
  • Up to 100% loan-to-cost on residential space and up to 75% on non-residential space
  • Amortisation up to 50 years; the exact terms follow the scoring tier, which rewards energy efficiency and accessibility
  • Minimum 5 units and a $1 million loan; the application cycle runs four to six months

The Planning and Code Path

Whether a residence needs a rezoning depends on who is building it and where. How it is built under the Building Code depends on its size.

Universities are largely exempt from the Planning Act
  • Since June 6, 2024, undertakings of publicly-assisted universities, and colleges federated or affiliated with them, for the institution’s objects are exempt from the Planning Act
  • The exemption does not apply on land in the Greenbelt Area
  • Since January 2026 a provincial regulation keeps Minister’s zoning orders applying to otherwise-exempt university projects
Colleges and private developers follow the usual route
  • Ontario’s public colleges of applied arts and technology are not named in that exemption, so confirm the planning route with the municipality first
  • A private developer building student rental needs the zoning a rental building of the same size needs
  • Off-campus projects seeking the CMHC student stream should line up the institution’s involvement before the application
Part 9 or Part 3 of the Building Code
  • Residential buildings of three storeys or less, with a building area up to 600 m², are designed under Part 9, the housing part of the code
  • Anything larger is a Part 3 building, designed and reviewed by architects and engineers
  • A one-storey cluster of modules usually stays in Part 9; a multi-storey residence usually does not
Ontario’s housing policy requirement
  • Since 2024 Ontario requires colleges and universities to publish their student housing policies
  • They must also make housing options available to incoming international students
  • The federal study-permit cap, in place for 2026, changes the intake you plan for; confirm current numbers with the institution

What Goes Into Your Submission

EpicMod is the manufacturer. The units, the drawings and the warranty come from the factory; the site work stays with your own contractors. That division is what a CMHC application or a board approval needs stated plainly.

  • The engineering drawing set for the permit: architectural and structural for an exterior-finished shell, plus mechanical and electrical and CSA A277 certification for fully finished units
  • Studio, one-bedroom and two-bedroom single-storey units, or wall, floor and roof panels manufactured to your own drawings for a larger residence
  • Delivery 10 to 12 weeks after order, with units built in parallel while foundations go in, so the schedule can be planned back from an intake date
  • Unit pricing fixed at contract, with the exclusions listed in full
Not included in the unit price
  • GST/HST, transportation and crane
  • Site clearing and servicing, foundations, utility connections, and permit or approval fees
  • Interior finishing on an exterior-finished shell. Site work is the property owner’s responsibility, handled by your own trades or your dealer’s crew
How you buy
  • Volumetric projects of 10 or more units can be supplied directly by EpicMod, at EpicMod’s discretion; smaller projects go through the dealer for the area
  • Panelized framing is supplied direct above 100,000 sq ft a year
  • See student housing supply

Student Housing FAQ

Yes. Since the 2024 federal budget the program covers on- and off-campus student housing. Off-campus projects need self-contained units of up to four bedrooms near the campus or on transit, and a post-secondary institution must be meaningfully involved. Rents must be comparable to on-campus housing, with increases limited for at least 10 years. The minimum is five units and a $1 million loan.
Yes, if it is established and operated otherwise than for profit. A non-profit university, public college or school authority building a student residence can qualify for the purpose-built rental rebate. It claims the public service body rebate first, and the rental rebate generally covers the GST, or federal part of the HST, that rebate did not recover. Construction must begin before 2031.
Ontario rebates 100% of the provincial part of the HST on purpose-built rental where the federal rebate conditions are met, and that route is documented for institution-built residences. Whether the newer Ontario enhanced rental rebate (ENRRP) applies to a particular student residence should be confirmed with the CRA or your accountant before you count on it.
Usually not. Since June 6, 2024, undertakings of publicly-assisted universities, and colleges federated or affiliated with them, for the institution’s objects are exempt from the Planning Act, except on Greenbelt land, and Minister’s zoning orders still apply. Public colleges and private developers should confirm the planning route with the municipality.
Because intake dates do not move. Units are built indoors while the foundations and services go in on site, and on a multi-unit order they are manufactured in parallel, so ten units follow the same 10 to 12 week schedule as one. The engineering drawing set comes with every order for the permit.

Planning Beds for an Upcoming Intake?

Send the unit count, the site and the target intake date. You get unit pricing, the exclusions in full and a delivery schedule your lender, CMHC or your board can work from.

Rules and amounts are drawn from each government body’s published material on the date shown. Programs and regulations change. Confirm with the administering body, your municipality and your own accountant or lawyer before making a decision. EpicMod does not provide tax, legal or planning advice.